Excavation Contractor Invoice Template
An excavation invoice is checked line by line against tickets: machine hours against the operator's log, truck loads against haul tickets, fill against delivery tickets, and disposal against dump receipts. Build the invoice the same way. Bill each machine by type and size with its hours and whether an operator is included, mobilization and demobilization as their own line, hauling by loads or truck hours with where the spoil went, fill and aggregate by material and tons or cubic yards, and disposal fees at cost with ticket numbers. Record the 811 locate ticket number and the trench protection used, because both show the job was done the way the contract and the law expect. Unforeseen conditions, such as rock, buried debris or groundwater, should be billed only as approved change orders on their own lines. This template is for excavation and site work contractors billing builders, general contractors and property owners for trenching, foundation digs, site grading, clearing and backfill. The download is an editable HTML file with the usual invoice header, line table and totals, plus the earthwork fields below. Fill it in your browser, then print it or save it as PDF.
Preview this editable document
Download the HTML file to edit its fields, then print or save as PDF. Totals are entered manually.
What This Template Includes
- Job site address and lot or site reference
- Contract, bid or purchase order reference
- Scope: trenching, foundation dig, site grading, clearing or backfill
- Equipment by machine and size, hours or days, and whether an operator is included
- Mobilization and demobilization (equipment transport)
- Hauling: loads or truck hours, and where spoil was taken
- Fill and aggregate: material, tons or cubic yards, delivered rate
- Disposal or dump fees at cost, with ticket numbers
- Compaction and finish grading
- 811 locate ticket number and date
- Trench protection used (sloping, shoring or trench box rental)
- Approved change orders, including unforeseen rock, debris or water
- Permit numbers and fees passed through
- Earlier deposit or progress invoices, and retainage held
How to Create Your Excavation Contractor Invoice
- 01
Describe your work
Type a plain English description of the services you provided, the client, and the amount.
- 02
AI generates your invoice
InvoiceQuickly's AI drafts the client, line items, dates, and totals for you to review before saving.
- 03
Review, download, and send
Check every detail, download the PDF, or use Pro to email the PDF directly to your client.
Recommended Payment Terms
Payment terms follow the contract and the client. Work for a general contractor or builder is usually billed after each phase or monthly, often on Net 30, and may have retainage held back until completion; quote the subcontract or purchase order number on every invoice and keep a running total of the contract, change orders, billed to date and retainage in the notes. Small jobs for property owners, such as a single trench or a driveway base, are often billed on completion and due on receipt or within 7 days. Some states limit deposits on residential work: California, for example, caps the down payment on a home improvement contract at $1,000 or 10% of the contract price, whichever is less, and forbids collecting payment ahead of work done or materials delivered. Price unforeseen conditions in the contract (for example an hourly rate for rock breaking) so a change order can be billed without renegotiating the whole job.
Need help writing payment terms? Read our guide to invoice payment terms for best practices and templates.
Tax Information
How excavation is taxed depends on the state and on who the client is. In Washington, construction work for property owners is a retail sale taxed on the whole contract price. In other states the contractor pays sales or use tax when buying materials such as gravel and pipe and does not charge sales tax on the contract, and fill sold and delivered without installation may be treated as a sale of goods. Check your state revenue department's guidance for contractors before adding tax, and keep your material and disposal receipts. InvoiceQuickly applies one tax percentage to the whole invoice and copies your saved tax ID to new invoice PDFs; add your licence number in the notes, and put lines with different tax treatment on separate invoices. This is not tax advice; check with your tax authority or an adviser.
Industry context (2026)
Two official requirements show up on a well-built excavation invoice. Before digging, the Common Ground Alliance's 811 service, the free national before-you-dig service, says anyone who plans to dig should contact 811 a few business days before starting, so utility owners can mark their lines with paint or flags; state one-call laws set the exact notice periods. During the work, the US Occupational Safety and Health Administration's excavation standard, 29 CFR 1926.652(a)(1), requires each employee in an excavation to be protected from cave-ins by an adequate protective system unless the excavation is made entirely in stable rock, or is less than 5 feet deep and a competent person finds no indication of a potential cave-in; OSHA's guidance sums this up as slope, shore or shield, with trench boxes as the shield. Recording the 811 ticket and the protection used costs one line in the notes and answers the first questions a general contractor or owner will ask if anything goes wrong. On residential jobs, state contractor rules can also limit what you bill up front, as California's $1,000 or 10% down payment cap on home improvement contracts shows.
Worked example
An excavation subcontractor digs a basement and a sewer lateral trench for a custom home, billing the general contractor time and materials under PO 2207, Net 30, with no sales tax assumed in this example. INV-0412 lines: mobilization and demobilization, lowboy transport of excavator and track loader, 1 × $650.00 = $650.00; 35,000 lb excavator with operator, 22 hours × $185.00 = $4,070.00; compact track loader with operator, 14 hours × $125.00 = $1,750.00; tri-axle dump truck haul-off to the county landfill, 18 loads × $140.00 = $2,520.00; landfill disposal at cost, tickets 4411 to 4428, 18 × $35.00 = $630.00; #57 stone for footing drains, delivered, 24 tons × $38.00 = $912.00; trench box rental at cost for the 6-foot lateral trench, 3 days × $175.00 = $525.00; change order #1, rock breaking with hydraulic hammer, approved by the general contractor on 6 November, 6 hours × $260.00 = $1,560.00. Total: $650.00 + $4,070.00 + $1,750.00 + $2,520.00 + $630.00 + $912.00 + $525.00 + $1,560.00 = $12,617.00. Notes: '811 ticket 2611-0042, requested 2 November, marks confirmed 5 November. Lateral trench 6 feet deep; trench box used. Copies of haul and dump tickets sent separately by email.' The general contractor can check every line against a ticket, the change order and the trench depth, so the invoice goes straight into the payment run.
Common mistakes to avoid
'Equipment' as one line
A single equipment total hides which machine ran and for how long. Bill each machine by type, size and hours, with mobilization separate.
Loads and tons without tickets
Haul, delivery and dump quantities are checked against tickets. Without ticket numbers on the invoice, the client has to ask, and payment waits.
Billing rock before it is approved
Unforeseen conditions billed without a signed change order look like padding. Stop, document, get approval, then bill on its own line.
No running total on progress invoices
On phased jobs for a general contractor, leaving out the contract value, billed to date and retainage forces the client to rebuild your numbers before approving them.
Deposits that break state rules
Some states cap deposits and forbid billing ahead of work on residential jobs. Check your licensing board before setting up the payment schedule.
Invoicing Tips
- 1Name each machine by type and size ('35,000 lb excavator with operator') rather than 'equipment'. Clients compare rates by machine class, and the size explains the rate.
- 2Bill mobilization and demobilization as their own line. Folded into hourly rates, transport looks like inflated machine time.
- 3Copy load counts and ticket numbers from haul and dump tickets, and keep the tickets. 'Haul-off, 18 loads, tickets 4411 to 4428' is hard to dispute.
- 4Put the 811 ticket number and the date the marks were confirmed in the notes. It records that utilities were located before you dug.
- 5If you hit rock, debris or groundwater, stop, photograph it, and get a written change order before billing the extra time as its own line.
- 6Show trench protection as a line when it is a real cost, such as a trench box rental at cost, rather than burying it in the hourly rate.
Related Resources
- Contractor invoicing: deposits, progress payments, retainage and change orders
- Construction invoicing guide
- Construction invoice example
- Progress billing guide
- Subcontractor invoicing
- All invoice templates
Frequently Asked Questions
What should an excavation invoice include?
Your business details and license number if you hold one, the client, job site, contract or PO, invoice number and dates, the scope, each machine with size and hours, mobilization, hauling by loads or hours, fill and aggregate by quantity, disposal fees with ticket numbers, the 811 ticket, trench protection, approved change orders, earlier invoices and retainage, the total and payment instructions.
How do excavation contractors bill: hourly or by the job?
Both are common. Fixed bids suit work you can measure, such as a foundation dig with known dimensions and soil reports. Hourly or time-and-materials billing suits uncertain ground, small jobs and emergency work. Many contractors bid a fixed price with stated hourly rates for unforeseen conditions billed by change order.
Do I need to call 811 before excavating?
Yes. The Common Ground Alliance's 811 service says anyone who plans to dig should contact 811 a few business days before digging, so utilities can mark their lines; the service is free. State one-call laws set the exact notice period and rules, so check your state 811 center, and record the ticket number on the invoice.
How do I bill for rock or other unforeseen conditions?
As an approved change order on its own line, with the change order number, what was found and the agreed rate or price, for example 'Change order #1, rock breaking with hydraulic hammer, 6 hours at $260'. Put the rate for unforeseen conditions in the contract so the change order is a formality.
Should trench protection appear on the invoice?
If it is a separate cost, yes. Federal OSHA rules require a protective system for employees in excavations 5 feet deep or more unless the excavation is entirely in stable rock, and for shallower trenches where a competent person sees signs of a possible cave-in. A trench box rental or shoring billed at cost shows the client what the protection cost.
Can InvoiceQuickly create an excavation invoice?
Yes. Describe the job, for example 'Excavator 22 hours at $185, 18 haul loads at $140, 24 tons of #57 stone at $38, trench box 3 days at $175', and InvoiceQuickly drafts an editable invoice you review before saving. There is no retainage or progress-billing feature and line amounts cannot be negative, so bill net amounts and keep the running totals, 811 ticket and license number in the notes.