Billing for architects
Architects usually bill a project fee in installments that follow the design phases, invoicing each month for the share of each phase completed, plus additional services and reimbursable expenses on separate lines. The fee itself is set one of three common ways: a fixed fee (a stipulated sum), a percentage of construction cost, or hourly rates. What makes a progress invoice easy to approve is showing, for each phase, the phase fee, the percentage complete, what was billed before and what this invoice adds. InvoiceQuickly can produce that invoice from line items, but it does not track phase percentages or the remaining fee across invoices for you, and it has no project accounting: Pro tracks time against a project, but not by phase. Free covers 5 invoices and 5 clients; Pro is $9/month.
Industry context (2026)
The AIA's owner-architect agreement, B101-2017, organises Basic Services into five phases: Schematic Design, Design Development, Construction Documents, Procurement, and Construction. AIA Contract Documents says the form can be used with a variety of compensation methods, including a percentage of construction cost and a stipulated sum, and its instructions list hourly billing rates, square footage, unit cost and royalty among other methods. The form leaves the basis of compensation for the parties to fill in, so there is no AIA-set fee or phase split. Source: AIA Contract Documents help center, "Summary: B101-2017" and "Instructions: B101-2017" (help.aiacontracts.com), accessed 27 October 2026. One tax point for New York: interior design services are subject to sales tax even when a licensed architect performs them, unless the work is the practice of architecture (New York State Department of Taxation and Finance, Tax Bulletin TB-ST-400, updated 16 October 2026, accessed 27 October 2026). Other states differ. This is general information, not legal or tax advice. Last reviewed: 27 October 2026.
Architects Invoicing Challenges
Progress billing that clients can check
A monthly invoice that says "Design Development, $6,720" prompts a call. One that says "Design Development, 60% complete, 25% billed previously, this invoice 35% of the $19,200 phase fee" can be checked against the drawings and approved. The client's lender or owner's representative may ask for the same breakdown.
Additional services that drift into the base fee
A client-requested redesign after schematic approval is usually an additional service under the agreement, billed hourly or as a quoted fee. If it is absorbed into the phase percentage, the base fee runs out before Construction Documents are finished.
Percentage fees that move with the cost estimate
Under a percentage-of-construction-cost fee, a change in the cost estimate can change each phase's value, depending on which estimate the agreement uses. If the agreement adjusts earlier phases to the latest estimate, the next invoice needs an adjustment line, not a silent change in the totals.
Long projects and reimbursables
A house can take two years from first sketch to completion. Printing, permit fees paid for the client and travel to site pile up in small amounts; billing them monthly on separate lines, at cost or with the markup your agreement allows, keeps them from being forgotten.
How InvoiceQuickly Helps Architects
Phase lines with decimal quantities
Each line is a description, a quantity and a unit price, and quantities accept two decimals. A progress line can therefore be the phase fee as the unit price and this invoice's share as the quantity: 0.35 × $19,200 = $6,720. Put the percentage complete and the amount previously billed in the line description so the arithmetic is on the page.
Additional services and reimbursables on their own lines
Hours (6 × $165) and costs (1 × $186.40) sit under the phase lines on the same invoice. You can type or say the month's lines and InvoiceQuickly drafts an editable invoice that you check before saving; Free includes 3 AI drafts, Pro is unlimited.
Fee proposals as estimates (Pro)
Send an additional-services proposal as an estimate. The client accepts or rejects it in a private portal, and an accepted estimate converts to an invoice in one step. Pro also adds email delivery with the PDF attached, scheduled reminders, credit notes for fee adjustments in the client's favour, and payment links through your own Stripe or PayPal account.
Partial payments and one tax rate
Record full or partial payments (bank transfer, check, card, cash or other) and the open balance stays visible. There is one tax percentage per invoice, applied to the whole subtotal after any discount, so if your state taxes some of your lines and not others, bill those on separate invoices.
A worked invoice example
Illustrative contract and figures. A small practice agrees a fixed fee of $96,000 for a new house. The agreement splits it by phase: Schematic Design 15% ($14,400), Design Development 20% ($19,200), Construction Documents 40% ($38,400), Procurement 5% ($4,800), Construction 20% ($19,200). That split is this contract's choice, not an AIA default. Additional services are billed at $165/hour and reimbursables at cost. Invoice INV-0034, end of month 4, net 30: Line 1: Design Development, 60% complete (25% billed on INV-0031); this invoice 35% of $19,200: 0.35 × $19,200.00 = $6,720.00 Line 2: Additional service, garage redesign requested 12 Oct: 6 × $165.00 = $990.00 Line 3: Reimbursable, printing for planning submission, at cost: 1 × $186.40 = $186.40 Total $7,896.40. Notes: Basic services billed to date $25,920 of $96,000 (27%): Schematic Design $14,400 (100%), Design Development $11,520 (60%). Remaining fee $70,080. Under a percentage fee the same phase moves with the estimate. At 8% of an $850,000 estimate, Design Development is worth 20% × 8% × $850,000 = $13,600; if the estimate rises to $900,000 it is worth $14,400. If your agreement also adjusts phases already billed, Schematic Design rises from $10,200 to $10,800, and the next invoice carries a $600 adjustment line. InvoiceQuickly prints these lines and notes, but the "billed to date" figures come from your own fee schedule; it doesn't calculate them across invoices.
When InvoiceQuickly fits, and when it does not
InvoiceQuickly fits a small practice or sole practitioner that bills a few projects a month by phase, is comfortable keeping its fee schedule in a spreadsheet, and wants a clean PDF, estimates the client can accept online and a payment record without adopting project-accounting software. It is the wrong tool if you need time tracked by design phase, automatic phase-to-date and fee-remaining calculations, budget versus actual reporting, consultant billing roll-ups, retainage, or invoices kept in two-way sync with QuickBooks or Xero. None of those exist in InvoiceQuickly today (Pro tracks time by project, and Business at $19/month exports reviewed invoices to QuickBooks Online or Xero one way), and architecture-specific project accounting software handles them. Two smaller limits: there is no deposit field, so an initial payment is either billed as its own invoice and referenced later in the notes, or recorded as a payment on the full-fee invoice, and unit prices can't be negative, so a fee reduction is issued as a credit note (Pro) rather than a minus line.
Last verified: October 2026
Create Your First Invoice from a Prompt
Describe your work in plain English, review the generated draft, and make any changes before sending.
Get Started FreeArchitects Invoice Templates
Architecture Invoice Template
Editable architecture invoice for fees billed by design phase or work stage: fee basis, phase fee and percent complete, billed to date, additional services, extra site visits, consultants and reimbursable expenses.
Progress Invoice Template
Editable progress invoice for contractors: schedule of values, work completed this period and to date, change orders, retainage withheld, previous billings and amount due.
Milestone Invoice Template
Editable milestone invoice for fixed-price projects: milestone number, deliverable and acceptance, percentage of contract, change orders and a running schedule.
Deposit Invoice Template
Editable deposit invoice: what the deposit secures, the total price, deposit percentage and amount, refund terms, tax on the deposit and the balance still to pay, with guidance on returnable security deposits.
Timesheet Invoice Template
Editable timesheet invoice: a dated hours log by task, client approval, regular and overtime hours at contract rates, the rounding rule and expenses kept apart from time.
Free Tools for Architects
Profit Margin Calculator
Check a phase fee against its cost: profit, margin and markup
Late Fee Calculator
Simple interest on an overdue installment at the rate your agreement sets
Payment Reminder Templates
Three fixed reminder emails (gentle, firm, final) to copy and fill in
Invoice Number Generator
Build prefix-number or prefix-date-number invoice numbering formats
Related guides
Frequently asked questions.
How do architects charge for their services?
The three common methods are a fixed fee (stipulated sum), a percentage of construction cost, and hourly rates, sometimes combined: a fixed or percentage fee for basic services and hourly rates for additional services. AIA's B101-2017 agreement can be used with these and other methods such as square footage or unit cost. The fee is then usually invoiced monthly as each phase progresses.
How much should you expect to pay an architect?
There is no standard schedule. The AIA's owner-architect agreement leaves the basis and amount of compensation for the parties to agree, and fees depend on project type, size, complexity, location and the services included. Compare proposals on the same scope and check which phases, meetings and site visits each one includes.
What are the phases of an architecture project for billing?
AIA B101-2017 uses five phases of Basic Services: Schematic Design, Design Development, Construction Documents, Procurement, and Construction. Many agreements assign a share of the fee to each phase and bill monthly by percentage complete. Projects under other forms of agreement, or outside the US, may use different stage names.
How should additional services be invoiced?
As separate lines, or a separate invoice, from the basic services fee, with what was requested, when, and the basis of the charge (hours × rate or the quoted fee). Agreeing additional services in writing before the work starts, for example as an accepted estimate, makes the invoice uncontroversial.
Can InvoiceQuickly track how much of each phase I have billed?
No. It records each invoice's lines and payments, but it does not keep a fee schedule or calculate phase-to-date percentages and remaining fee across invoices. Keep those in your own schedule and type the billed-to-date summary into the invoice notes, which print on the PDF.
Is there a free app that can create my own invoice?
InvoiceQuickly's Free plan lets you create 5 invoices for up to 5 clients, with 3 AI drafts and PDF download, and no card is required. A practice billing several projects monthly will need Pro ($9/month) for unlimited invoices, email delivery, estimates and the client portal.
Useful, occasional notes
Get invoicing tips for architects
Occasional invoicing tips, tax reminders and product updates by email. Unsubscribe at any time.
No spam, ever. Unsubscribe anytime.